The vapor retarder was installed on the hot side of the installation. Because it was installed behind the plywood sheathing on the metal studs, it resulted in a clear line of demarcation between deteriorated plywood and plywood that is not deteriorated. This building is in CFL, has anyone ever seen this occur on your projects?